Project Layout – Proof 2 Op2

Project 2: Improve Mechanical Utilities, Phase 4

Mechanical, Electrical, & Plumbing

Project Details

Gainesville, FL
Client: Department of Veterans Affairs
Project Size: 1M to 5M

Project Description

For this design-bid-build firm fixed price contract SCS acted as the general contractor as well as self-performed the following trades; demolition, mechanical piping, ductwork, electrical, and equipment installation.
This project’s scope of work included the installation of a new 80,000 CFM located on the second floor roof which included chilled water coils, steam humidifier, and steam heating coils. In order to support the new unit and entirely new structural steel platform was erected completed with stairs and walk ways around the exterior. Once the unit was installed a new mechanical penthouse was constructed around the AHU to protect the AHU and associated systems from the elements. This project also included the removal and installation of a 21,000 CFM indoor central station AHU. Additional work included the installation of 97 new single coil VAV’s on two entire floors of the main hospital with services to admin areas, patient rooms, CLC, laboratories, and surgery suites. New supply ductwork was installed throughout the two five renovated floors to allow the existing dual duct system to be converted to a supply and return ductwork system.

Project 2: Improve Mechanical Utilities, Phase 4

Mechanical, Electrical, & Plumbing

Project Details

Gainesville, FL
Client: Department of Veterans Affairs
Project Size: 1M to 5M

Project Description

For this design-bid-build firm fixed price contract SCS acted as the general contractor as well as self-performed the following trades; demolition, mechanical piping, ductwork, electrical, and equipment installation.
This project’s scope of work included the installation of a new 80,000 CFM located on the second floor roof which included chilled water coils, steam humidifier, and steam heating coils. In order to support the new unit and entirely new structural steel platform was erected completed with stairs and walk ways around the exterior. Once the unit was installed a new mechanical penthouse was constructed around the AHU to protect the AHU and associated systems from the elements. This project also included the removal and installation of a 21,000 CFM indoor central station AHU. Additional work included the installation of 97 new single coil VAV’s on two entire floors of the main hospital with services to admin areas, patient rooms, CLC, laboratories, and surgery suites. New supply ductwork was installed throughout the two five renovated floors to allow the existing dual duct system to be converted to a supply and return ductwork system.

Project 2: Improve Mechanical Utilities, Phase 4

Mechanical, Electrical, & Plumbing

Project Details

Gainesville, FL
Client: Department of Veterans Affairs
Project Size: 1M to 5M

Project Description

For this design-bid-build firm fixed price contract SCS acted as the general contractor as well as self-performed the following trades; demolition, mechanical piping, ductwork, electrical, and equipment installation.
This project’s scope of work included the installation of a new 80,000 CFM located on the second floor roof which included chilled water coils, steam humidifier, and steam heating coils. In order to support the new unit and entirely new structural steel platform was erected completed with stairs and walk ways around the exterior. Once the unit was installed a new mechanical penthouse was constructed around the AHU to protect the AHU and associated systems from the elements. This project also included the removal and installation of a 21,000 CFM indoor central station AHU. Additional work included the installation of 97 new single coil VAV’s on two entire floors of the main hospital with services to admin areas, patient rooms, CLC, laboratories, and surgery suites. New supply ductwork was installed throughout the two five renovated floors to allow the existing dual duct system to be converted to a supply and return ductwork system.